Ghani Leo Frando, & Mulya, E. S. (2025). Implementation of Column Formwork Works on the 10th Floor in the Construction of Sky House Alam Sutera Phase 3 Building. Journal of Engineering and Science, 4(2), 67-77. https://doi.org/10.56347/jes.v4i2.309