This research aims to optimize the performance of the voltage system at the Nagan Raya Steam Power Plant (PLTU) by installing capacitor banks. Capacitor banks are integrated into the system to increase voltage stability, reduce power losses, and increase energy efficiency in PLTUs. The research method involves analyzing the existing voltage system, designing the capacitor bank installation, and evaluating the system performance after installation. It is hoped that the results of this research can make a positive contribution in improving the performance of PLTU Nagan Raya and overall energy efficiency.
Discover other articles with topics similar to what you're currently reading. Find more references and expand your knowledge base.
Arhami, M. Nizar Machmud, Masri Ali
Vol. 1 No. 1 (2022): January-June 2022Rakhmad Syafutra Lubis, Teuku Muhayatsyah, Mahdi Syukri, Ramdhan Halid Siregar, Saifuddin Muhammad Jalil
Vol. 4 No. 1 (2025): JuneElvy Sahnur Nasution, Suriadi, Azhar
Vol. 1 No. 1 (2022): January-June 2022Syukriyadin, Ira Devi Sara, Syahrizal, Muamar Kadafi
Vol. 1 No. 2 (2022): July-December 2022Elvy Sahnur Nasution, Suriadi, Azhar
Masri, Suhaeri, M. Nizar Machmud, Zainuddin, Saifuddin, Azhar
Suriadi, Saddam Azmi, Mansur Gapy, Masri Ali, Arhami, Masri Ibrahim, Suhaeri, Elvy Sahnur Nasution
Suhaeri, Masri, Azhar, Saifuddin
Suriadi, Ira Devi Sara, Ahmad Syuhada, Masri, Asri, Khairul Umurani
Masri, Suhaeri, Dwi Noviana, Azhar
Dandi Bachtiar, Januar Parlaungan Siregar, Mohd Iqbal, Masri, Zulfadhli, Muhibbuddin
Syukriyadin, Ira Devi Sara, Syahrizal, Muamar Kadafi
Masri, Suhaeri, Arhami, Mohd. Nizar Machmud, M. Faris Aufa Masri
Rakhmad Syafutra Lubis, Teuku Muhayatsyah, Mahdi Syukri, Ramdhan Halid Siregar, Saifuddin Muhammad Jalil