This research focuses on analyzing power losses due to load imbalance in the medium-voltage distribution network in Pasar Aceh. The aim is to determine the magnitude of power losses that occur at the distribution substation in Pasar Aceh. The research method involves analysis, calculations, and simulations using the ETAP 12.6 software. The results of the analysis indicate that load imbalance in the Pasar Aceh substation leads to power losses. The Trafo Samping Pasar Aceh experiences power losses of 0.77% with a load imbalance of 16.33%. The second transformer in the BNI 46 area incurs power losses of 0.98% with a load imbalance of 30.33%, and the transformer in the BLKG KOTTY area has power losses of 1.17% with a load imbalance of 50.33%. These findings affirm that the greater the load imbalance, the higher the resulting power losses in the electrical distribution network.

Article Usage Statistics

OJS Statistics
Share this article:

Author Biographies

Suriadi Universitas Syiah Kuala

Program Studi Teknik Elektro, Fakultas Teknik, Universitas Syiah Kuala, Darussalam Banda Aceh, Provinsi Aceh, Indonesia.

Ira Devi Sara Universitas Syiah Kuala

Program Studi Teknik Elektro, Fakultas Teknik, Universitas Syiah Kuala, Darussalam Banda Aceh, Provinsi Aceh, Indonesia.

Ahmad Syuhada Universitas Syiah Kuala

Program Studi Teknik Mesin, Fakultas Teknik, Universitas Syiah Kuala, Darussalam Banda Aceh, Provinsi Aceh, Indonesia.

Masri Universitas Syiah Kuala

Program Studi Teknik Mesin, Fakultas Teknik, Universitas Syiah Kuala, Darussalam Banda Aceh, Provinsi Aceh, Indonesia.

Asri Universitas Malikussaleh

Program Studi Teknik Elektro, Fakultas Teknik, Universitas Malikussaleh, Kec. Muara Batu, Kabupaten Aceh Utara, Provinsi Aceh, Indonesia.

Khairul Umurani Universitas Muhammadiyah Sumatera Utara Medan

Program Studi Teknik Mesin, Fakultas Teknik, Universitas Muhammadiyah Sumatera Utara Medan, Indonesia.

How to Cite

Suriadi, Sara, I. D., Syuhada, A., Masri, Asri, & Umurani, K. (2023). Analisis Ketidakstabilan Beban Arus Netral dan Rugi-Rugi Daya Pada Trafo Distribusi Penyulang Pas 21 PT. PLN UPB Banda Aceh. Journal of Engineering and Science, 2(2), 69-83. https://doi.org/10.56347/jes.v2i2.167

License & Copyright

Copyright (c) 2023 Journal of Engineering and Science

This is an open-access journal. All articles are distributed under the terms of the Creative Commons Attribution 4.0 International License (CC BY 4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

Creative Commons Attribution 4.0 International (CC BY 4.0)

Under this license, you are free to:

  • Share: copy, distribute, and transmit the work in any medium or format.
  • Adapt: remix, transform, and build upon the work for any purpose, even commercially.

Attribution Requirements

You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.

Copyright and Retention Copyright & Retention Authors retain copyright without restrictions and grant this journal the right of first publication under an open-access model. The journal retains non-exclusive publishing rights for archiving, indexing, and scholarly dissemination.

References

Total: 21 References
  • Hermawan. (n.d.). "Analisis Terhadap Performance Sistem Tenaga Listrik Memakai Metode Aliran Daya." [Judul Jurnal], 17–28.
  • D. Menggunakan, & S. Powerworld. (2015). "Studi Aliran Daya Pada Sistem Kelistrikan Sumatera Bagian Utara (Sumbagut) 150 Kv Dengan Menggunakan Software Powerworld Versi 17." Singuda ENSIKOM, 11(30), 47–52.
  • D. S. W. Jayabadi, B. Winardi, & M. Facta. (2017). "Analisis Ketidakseimbangan Beban Trafo 1 Gi Srondol Terhadap Rugi-Rugi Akibat Arus Netral Dan Suhu Trafo Menggunakan Etap 12.6.0." Transient Jurnal Ilmiah Teknik Elektro, 5(4), 425–431. Retrieved from https://ejournal3.undip.ac.id/index.php/transient/article/view/16826.
  • G. National, & H. Pillars. (n.d.). "Analisa Aliran Daya Pada Sistem Tenaga Listrik Menggunakan Software ETAP 12.6." [Judul Jurnal], 6(3).
  • G. National, & H. Pillars. (n.d.). "Analisis Rugi - Rugi Daya Sistem Distribusi dengan Peningkatan Injeksi Jumlah Pembangkit Terbesar."

Similar Articles

Explore related articles published in this journal.

Most read articles by the same author(s)

Explore other articles by these authors.

Sistem Analisis Desain Pembangkit Listrik Tenaga Surya Kapasitas 50 WP

Elvy Sahnur Nasution, Suriadi, Azhar
Vol. 1 No. 1 (2022)

Optimalisasi Performa Sistem Tegangan dengan Pemasangan Kapasitor Bank pada Pembangkit Listrik Tenaga Uap (PLTU) Nagan Raya

Mahdi Syukri, Suriadi, Ira Devi Sara, Ramdhan Halid Siregar, Muhibbuddin, Masri
Vol. 2 No. 1 (2023)

Eksperimen Pengaruh Kecepatan Pada Diameter Nozzle 2,5 mm dalam Proses Laser Cutting

Masri, Suhaeri, M. Nizar Machmud, Zainuddin, Saifuddin, Azhar
Vol. 2 No. 2 (2023)

Perbaikan Tegangan dengan Menggunakan Kapasitor Bank 25 MVAR pada Gardu Induk Banda Aceh

Suriadi, Saddam Azmi, Mansur Gapy, Masri Ali, Arhami, Masri Ibrahim, Suhaeri, Elvy Sahnur Nasution
Vol. 2 No. 1 (2023)