Optimalisasi Performa Sistem Tegangan dengan Pemasangan Kapasitor Bank pada Pembangkit Listrik Tenaga Uap (PLTU) Nagan Raya

Authors

  • Mahdi Syukri Universitas Syiah Kuala
  • Suriadi Universitas Syiah Kuala
  • Ira Devi Sara Universitas Syiah Kuala
  • Ramdhan Halid Siregar Universitas Syiah Kuala
  • Muhibbuddin Universitas Syiah Kuala
  • Masri Universitas Syiah Kuala

DOI:

https://doi.org/10.56347/jes.v2i1.165

Keywords:

PLTU, ETAP 12.6.0, Power Flow, Capacitor, Substation

Abstract

This research aims to optimize the performance of the voltage system at the Nagan Raya Steam Power Plant (PLTU) by installing capacitor banks. Capacitor banks are integrated into the system to increase voltage stability, reduce power losses, and increase energy efficiency in PLTUs. The research method involves analyzing the existing voltage system, designing the capacitor bank installation, and evaluating the system performance after installation. It is hoped that the results of this research can make a positive contribution in improving the performance of PLTU Nagan Raya and overall energy efficiency.

Author Biographies

  • Mahdi Syukri, Universitas Syiah Kuala

    Program Studi Teknik Elektro, Fakultas Teknik, Universitas Syiah Kuala, Darussalam Banda Aceh, Provinsi Aceh, Indonesia.

  • Suriadi, Universitas Syiah Kuala

    Program Studi Teknik Elektro, Fakultas Teknik, Universitas Syiah Kuala, Darussalam Banda Aceh, Provinsi Aceh, Indonesia.

  • Ira Devi Sara, Universitas Syiah Kuala

    Program Studi Teknik Elektro, Fakultas Teknik, Universitas Syiah Kuala, Darussalam Banda Aceh, Provinsi Aceh, Indonesia.

  • Ramdhan Halid Siregar, Universitas Syiah Kuala

    Program Studi Teknik Elektro, Fakultas Teknik, Universitas Syiah Kuala, Darussalam Banda Aceh, Provinsi Aceh, Indonesia.

  • Muhibbuddin, Universitas Syiah Kuala

    Program Studi Teknik Mesin, Fakultas Teknik, Universitas Syiah Kuala, Darussalam Banda Aceh, Provinsi Aceh, Indonesia.

  • Masri, Universitas Syiah Kuala

    Program Studi Teknik Mesin, Fakultas Teknik, Universitas Syiah Kuala, Darussalam Banda Aceh, Provinsi Aceh, Indonesia.

References

Aturan Jaringan Sistem Tenaga Listrik Sumatera (Grid Code), Kementrian Energi dan Sumber Daya Mineral. (2009).

Beaty, H. Wayne. (2000). Handbook Of Electric Power.

Gonen, Turan. (1988). Modern Power System. John Wiley and Sons, Inc., Kanada.

Grainger, John J., & Stevenson, W. D. Jr. (1994). Power System Analysis. McGraw-Hill.

Gonen, Turan. (1986). Electric Power Distribution System Engineering. McGraw-Hill Book Company.

Natarajan, Ramasamy. (2005). Power System Capacitors. Taylor & Francis Group, LLC.

Saadat, Hadi. (2004). Power System Analysis, Second Edition. McGraw-Hill.

Stevenson, W. D. Jr. (1975). Elements Of Power System Analysis, Third Edition. McGraw-Hill, Tokyo-Jepang.

T.S. Hutauruk. (1985). Transmisi Daya Elektrik. Erlangga, Jakarta.

Lesnanto Multa P., Restu Prima Aridani. (2013). Modul Pelatihan Etap. Yogyakarta: JTE Universitas Gadjah Mada.

Downloads

Published

2023-04-25

How to Cite

Syukri, M., Suriadi, Sara, I. D., Siregar, R. H., Muhibbuddin, & Masri. (2023). Optimalisasi Performa Sistem Tegangan dengan Pemasangan Kapasitor Bank pada Pembangkit Listrik Tenaga Uap (PLTU) Nagan Raya. Journal of Engineering and Science, 2(1), 36-44. https://doi.org/10.56347/jes.v2i1.165
Most read articles by the same author(s)

Other papers published by author(s) in this journal:

Sistem Analisis Desain Pembangkit Listrik Tenaga Surya Kapasitas 50 WP
Eksperimen Pengaruh Kecepatan Pada Diameter Nozzle 2,5 mm dalam Proses Laser Cutting
Perbaikan Tegangan dengan Menggunakan Kapasitor Bank 25 MVAR pada Gardu Induk Banda Aceh
Penelitian Efek Penggunaan Grid Tie Inverter pada Sistem Hibrid dengan Solar Panel dan Diesel
Analisis Ketidakstabilan Beban Arus Netral dan Rugi-Rugi Daya Pada Trafo Distribusi Penyulang Pas 21 PT. PLN UPB Banda Aceh